Last Hope Target
- Carlisle recently acquired a two year option on the Last Hope Project
- Historical resources (non 43-101 compliant) were estimated in 1992 at 888,000 tonnes of 9.4 g/t for 270,000 oz
- Historical drilling has significant depth potential as the resource estimate was only calculated to a depth of approximately 150m
- Several holes intersected high grade material below 400m
- Majority of historical drill core intact and available at the mine site
- 2011 program includes re-assaying of historical core
- New NI 43-101 to be completed in Q4 2011
Long Section through the Last Hope deposit with historical drill intercepts. Click to enlarge.